A last minuet decision to have a workday was actually a very good choice as it was a productive day. We started with Neil and Jamie lifting the slabs around the side of the signal box ready for the digging of a trench to run power to the far side of the site. In the mean time, Dave worked on the painting of the pavilion which is nearing completion, we just need to finish the door frames and shelves. We can then move on to complete the kitchen area which will have a second door added between the kitchen and toilet to allow the hygienic serving of tea, coffee and cake to the public. After lunch, Jamie and Neil worked to remove the ballast from the path of the trench to be and then Neil went on to do some pruning and weeding. Jamie started work on the trench for the power cable and got to the end of the box before stopping for the day.
All in all, a successful work day, even though we only got three people turn up (in fairness, it was short notice).
No comments:
Post a Comment