SIGNAL DETECTOR SWITCHES
Sept/Oct 2026
Signals 3, 5 and 13 have been fitted with detector switches. Prior to this detection was from the lever frame, and therefore not a true representation of the actual signal arm position.
New cables have been routed from each signal back to the locking room and the connections made at each end.
Signal 13, showing cable coiled up ready for connecting.
Cables from signals 5 and 13 in the locking room. (Coiled and labelled ready for connecting.)
This work has now been completed and works well.












