Facebook

Like/follow

Like us on Facebook and follow us on Twitter

Twitter

Wednesday, 1 March 2023

Education Building Work Progressing


Work inside the education building is rapidly progressing.


 The track circuit interactive display is all but complete and looks great.

The high level railway track is also taking shape.



The second room is also progressing with new shelving being installed.

At this rate the building will soon be ready for opening!

Discussions are taking place about standardized signage throughout the site. This should give us an even more professional look. This includes The Buffer Stop cafe, where the menus and other signs could certainly do with an upgrade. I, as the main cafe organiser, will be very pleased to see these.

More news soon hopefully.

Dave

No comments:

Post a Comment