The Great shed move

On the 26 of December, the members of Romsey signal box turned up to 'make their move' on the shed. The shed needed to move to allow the construction of the new building which will not only house Cowly bridge junction, model signal box, but will be our meet and greet building. In the month leading up to the move, members Gavin, Jamie, Ray, Keith, Dave, Neil,Peter and Tom spent time moving the compost heap, clearing the area, then levelling and paving it ready for the big day.



The day started by clearing the shed and then dismantling the shelving which had been built into the shed when it was first erected. After this the lean-3 was removed and the shed was ready to depart. To save time, instead of dismantling the shed, moving it, and reassembling it, the members jacked it up onto 2 trolley jacks and 'simply'



wheeled it to its new home. After a few close encounters with a shed (and a well earned lunch break), the shed was very happy in its new location. But now the team were against the clock to reassemble the shelving, reattach the lean-3 and then re-load the shed with its contents before it got dark

After forgetting how the shelves had come out, then trying multiple combinations, the shelves were finally reassembled and the shed was almost ready to be reloaded.
Following a bit of elbow grease and alto of lifting, the very heavy lean-3 was finally positioned alongside the shed ready for re attachment, once this was completed the movement was complete. The members could now breath easy as the shed was repositioned and all that was left, was to sort through  the contents of the shed, decide what we wanted to keep, and then reload the shed.


So, now Romsey signal box can now proudly, we have the most travelled shed in Hampshire, if not England.


 (Keith is hiding behind the camera, don't think you can hide that easily Keith!!!)