Firstly the guttering was altered to route all of the rain water to the soak away.
Then the soak away was covered up with soil
Once competed, Dick moved on to cement broken pieces of slab to the base of the new building, this is to stop the more fragile parts of the foundation being washed away and also help protect it, once we level the path to the new building.
No comments:
Post a Comment